The Lance Symthe Hardaway Memorial Chapel

Day One - The slave labour lays the foundation down for the Symthe Hardaway Memorial Chapel. The first layer of the walls were also mortared in. The front door of the bell tower was erected.
4
3
2
1
Day Two - The entire first floor was completed. Symthe Hardaway needs to purchase a few more peasants for the manual labour since they got into the beer supply. Guess he also has to restock the beer cellar. And no... it is not a photo magic trick, the front door actually opens and closes on hinges...
6
7
8
9
1o
Day Three - Definite inventory problem with the construction. The foreman thought he had an additional 50 lb box of grey but it was actually a box of buff. Therefore, there is a building supply shortage until new material arrives. The roof was built but it has to be cut to fit the tower. The second level of the tower was built and the floor added. The tower separates to place figures on the second floor. An arch was built from the passage to the tower and main chapel. A removable fireplace/altar/niche was built for the back wall. The boys are celebrating their milestone. Now I know where my ale disappeared to.
13
16
14
15

Day Four - Ordered an additional 100 lbs of casting plaster. Finished the top of the bell tower so that it will come apart for using the inside. Put structure supports in the roof and fitted roof to the chapel and the tower with a addition of the back wall and wings.

17
18
19
20
21
22
Day Five - Painted the roof and added trim. The workers raided my ale stash again.
24
25
26
27
28
29
30
31
32
33
34
35
36
Day Six - Cut the shingled roof sections for the bell tower roof. Added trim and structural support for the tower. Painted the roof, added a cross. I then decided that the way Lance Symthe Hardaway plays Pig Wars, maybe he may need a fortified tower to protect him from both his foes and allies. Built an additional add-on that can be swapped out. Finished up the chapel.
37
38
39
40
41
42
43
44